Welcome to US

Industrial Cleanroom & Controlled Environment Systems Contractor

Home Welcome to US Expert Database

Expert Team

The company consistently adheres to the principle of 'beginning with the end in mind' and implements lean construction, continuously pursuing higher design and construction precision. In the initial stages of a project, seasoned EPC project managers collaborate with the company's expert team to provide Class 1 to Class 9 international standards—equivalent to 100,000 to 300,000-grade cleanrooms—along with clean process solutions for airborne particulate control in clean zones, tailored to the industrial structure and requirements of each enterprise. The technical center team comprises professionals from top-tier universities (985 and 211 institutions), holding industry qualifications and certifications. The team includes HVAC engineers, electromechanical engineers, first-class construction engineers, senior interior designers, intermediate and senior engineers, and experienced project managers, with an average of 15 years of expertise in industrial cleanroom construction. They remain at the forefront of the industry, conducting in-depth research and analysis on industry trends and engineering advancements.
Muyi
National second-level construc
Muyi
Kevin
Technical Director
Kevin
Jake
National second-level construc
Jake
King
National second-level construc
King
Evelyn
National First-Class Construct
Evelyn
Jim
Senior interior designer
Jim
Klose
Senior interior designer
Klose
Allen
Senior Weak Current Engineer
Allen
Owen
National second-level construc
Owen
Andy
Senior HVAC engineer
Andy
Zhou Caichao
Senior Project Manager
Zhou Caichao
Dillon
Senior interior designer
Dillon
Kun
Senior HVAC engineer
Kun
Jason
National second-level construc
Jason

A team of 50+ designers building high-quality projects

Drawing Design
Based on client-provided process diagrams, sketches, and suboptimal layout drawings, we perform professional-level optimization to achieve rational process layouts for functional areas, including personnel and material flow paths.
Architectural & Steel Structure Engineering
Conduct on-site surveys as needed, perform precise load-bearing calculations, and propose and implement secondary steel structure construction to meet the load-bearing requirements of the cleanroom. Cleanroom decoration, including clean lighting, cleanroom doors/windows, partitions, ceilings, and other finishing processes.
HVAC Purification Engineering
Supported by a team of seasoned HVAC purification engineers, we precisely calculate airflow requirements, air supply methods, ductwork layout, and environmental treatment processes based on product manufacturing needs.
Power Supply Engineering
Senior electromechanical engineers conduct on-site surveys to accurately calculate power consumption and optimize the layout of power distribution as well as electrical wiring installation, tailored to the client's production process requirements.
Cleanroom System Engineering
We can design and implement customized solutions for cleanroom automation, including temperature & humidity control automation, equipment automation, and display automation, tailored to client requirements.
Flooring & Purification Equipment Engineering
Flooring Options: Epoxy self-leveling floors, PVC floors, or other floor types. Cleanroom Supporting Equipment: Air showers, cargo showers, clean benches, pass-through windows, and other purification equipment.