Case of Great Wall Development Technology Electronic Device Purification Project
Cleanliness Class:Class 100
Construction method:EPC
Project address:Guangdong
Case of Huarong Electronics Plant Purification Project
Customer introduction:The company successfully signed the EPC general contract for the clean room and mechanical and electrical engineering construction project of Huarong Electronics (Guangdong) Co., Ltd.
Huarong Electronics (Guangdong) Co., Ltd. is a subsidiary invested by Huarong International Company in Shijie Town, Dongguan City. The head office was established in Kaohsiung in 1983 and listed in 1997. Huarong Electronics Company and Huarong Shanghai Company were established in 1998, Huarong USA Company was established in 1999, and Huarong Kunshan Company was established in 2003. The total capital invested by the company is 92 million US dollars, the total number of employees is 2000, covering an area of nearly 20000 square meters, with two factories and three dormitories, belonging to high-tech air-conditioned closed factory buildings. The company takes the development path of collectivization, starting from electronic components, and gradually developing into an information equipment manufacturer. The main products are: metallized plastic film capacitor series products; at present, the company ranks second in the world's plastic film capacitor manufacturing industry.
Project name:Clean room and electrical and mechanical work
Project address:Dongguan, Guangdong
Industry category:Electronic components
Project content: 1、Constant temperature and humidity environment system
2、Interior works
3、Intelligent and Automatic Control System Project
4、Heating, ventilation and electrical engineering
5、process cooling water
6、RO/DI reverse osmosis, compressed air
7、More.....
Purification project case shot, only part of the picture is shown.